<< Back to Portfolio
Launched 01 March 2014
The client intends to develop an Early Gas Production, at a coastal site in the Ivory Coast. The area is little developed, and thus there is a lack of geological and geotechnical data in the surrounding area. The zone is alluvial plain, and swamp lands, and thus a ground investigation specification was required, to ensure a high quality understanding of the ground conditions at the site. Structures include flare stacks, and contra-rotating plant.